Mortar in Construction Safe Work Procedure

Next

Block Laying Mortar Method Statement

The mortar in construction method statement assesses the risk following the hazard identification process for laying concrete blocks and the subsequent implementation of risk controls to manage risks.

  • Method statement for masonry works requires control measures to be implemented per the risk controls hierarchy for mixing mortar for masonry.

Fire Sample P1.png
Fire Sample P24.png
Fire Sample P34.png
Fire Sample P37.png

Masonry Mortar SWMS Example

Click on the images to view a SWMS example of what you will receive when purchasing one of our SWMS.

​

Your business details and company logo will be added to the document and emailed to you.

Mortar in Construction

Workplace Safety has conducted a comprehensive hazard analysis for mixing masonry mortar, e.g. how to mix masonry mortar with control measures developed for identified hazards per the hierarchy of risk controls.

  • Assess and review health and safety practices in the workplace to control risk

  • WHS consultation with employees on health and safety matters to identify potential hazards with how to make masonry mortar

  • Risk assessment to identify hazard and risk in the workplace that could result in death or serious injury

  • Health and safety planning for how to make a mortar mix for laying concrete blocks, e.g. minimise risks through the planning process

  • WHS consultation and participation processes ensure adequate health and safety communication

  • Workplace environmental hazards, e.g. trenches and excavations, falling from height, electrical hazards

  • Slip trips and falls in the workplace having the potential to cause death or serious injury

  • Implementation of controls for mixing block laying mortar, e.g. isolation of hazards, RCD protection, personal protective equipment

  • Health and safety at work information for employees to manage risk and compliance

  • Tools and equipment used in the mixing of cement mortar and transfer to masonry mortar boards, e.g. cement mixer, hand tools

  • Inspect cement mortar mixer and implement control measures for minimising manual handling risk

  • Masonry mortar mix ratio per concrete blockwork specification using cement mortar ingredients

  • Transfer masonry mortar mix to wheelbarrow and transfer it to the required position where the cement mortar is transferred to masonry mortar boards

  • Personal decontamination procedures to be implemented where exposure to silicahas taken place, e.g. correct method for removing PPE

  • Working at height on modular scaffolding, brickies scaffolding and bricklaying trestles when placing mortar on masonry mortar boards

  • Hazardous chemicals used in connection with mixing cement mortar, e.g. Portland cement, de-hydrated lime, plasticizer

  • Hazardous manual tasks in connection with mixing masonry mortar and loading it to masonry mortar boards

  • Personal protective equipment, e.g. construction safety glasses, safety works gloves, construction hard hat

  • WHS training for workers, e.g. health and safety training for mixing cement mortar

  • Workplace housekeeping incorporating material handling and storage safety

  • Legislative and regulatory requirements for compliance with WHS legislation, e.g. WHS regulations, block laying code of practice and block laying standards

  • Monitoring controls, e.g. assessment and review the effectiveness of control measures

  • Blockwork tasks and activities in connection with mixing cement mortar

SWMS Blocklaying

Mortar for Construction

Blocklaying SWMS shall assess the risk of construction high-risk activities for mixing and loading masonry mortar mix.

High-risk work activities that may expose workers to WHS hazards are likely to include but not be limited to:

  • Plant and equipment used in the work task, e.g. cement mixer

  • Work at height, e.g. fall from heights

  • Manual handling tasks of transferring the cement mortar mix

  • Exposure to hazardous chemical, e.g. Portland cement

  • Other hazards with mixing and loading cement mortar to mortar boards

Mortar for Block Laying
You may also need:
Block Work Method Statement
SWMS for Rodding Mortar Dags.jpg
Concrete Block Lintel SWMS
SWMS for Rodding Mortar Dags.jpg
SWMS for Rodding Mortar Dags
SWMS for Rodding Mortar Dags.jpg
Safety Management System
SWMS for Rodding Mortar Dags.jpg
bottom of page